|
|
|
Hurray! As
most of you know, the long-awaited Club
expansion has been approved and construction is
underway! We are very excited about it and plan
to provide everyone with a rendering showing all
of the new and exciting changes, which will be
posted inside the Club, ASAP. In the meantime,
here is a brief synopsis about the project:
- The
construction of the expansion (new building)
will take approximately 16-18 months.
- After
construction, the new building will be
joined together with the existing building.
- The new
building will include three levels of
underground parking, a new Jr. Olympic size
swimming pool, which will be 25 yards long
and 5 lanes wide, new men's and women's
locker rooms, including new whirlpools,
saunas, and steam rooms, a private spa, a
more expansive and comprehensive women's
only private workout room, which will
provide direct access to and from the new
women's locker room, a rock climbing wall, a
restaurant, and 29 room four star hotel with
views of Shilshole Bay and the Olympic
mountains.
- The
existing pool and ground floor pool locker
rooms will remain. (The Club will have
two swimming pools!)
- The
existing 2nd floor adult men's locker room
will be remodeled to create a new group
exercise studio, which will be referenced in
the Activity Schedule as "Studio C." This
will allow us to expand the existing
basketball schedule and offer 5 different
venues for group exercise classes
simultaneously, including studio cycling and
swimming.
- The
existing 3rd floor adult women's locker room
will be remodeled to create a new group
cycling studio.
- The
existing 2nd floor cycling studio will be
restored and converted back to a racquetball
court.
- During
construction, Olympic will provide
additional FREE customer parking located
three blocks away at the former Yankee Grill
on Shilshole Avenue NW.
For more
information and details about this exciting
project please feel free to speak with a
membership representative. |
|
|
|